TECHNICAL SPECIFICATION :
1. POWER ON : MCB SWITCH
2. ON OFF INDICATOR PUSH BUTTON
3. VOLTE METER : SHOW ON OUT PUT HIGH VOLTAGE (Digital type meter)
4. CURRENT METER : SHOW ON LEKAGE CURRENT (Digital type meter)
5. PROTECTION : OVER LOAD TRIP PROTECTION LV & HV both side AC-DC HV
6. TIMER : TESTING TIME 1,2,5 MIN( inbuilt un visible timer)
7. CONNECTION :- POLARITY CONNECTOR PROBE IN PUT & OUT PUT CONNECTION
CONTROL PANEL DESCRIPTION :
- INPUT SUPPLY 230 VAC 50 Hz 1 Ph
- POWER ON Switch
- SAFETY KEY
- Control Unit Start Push Button
- Control Unit Stop Push Button
- Timer ON Switch with indication
- Timer RESET Push Button
- Test ok indication lamp
- Leakage current meter reading push ON Switch
- Set High Voltage KNOB with zero start protection
- Output High Voltage Indicating Meter for AC- DC
- Output Current leakage Indicating Meter AC – DC
- Input Supply short circuit Protection MCB
- Input Supply IP 44 Socket
- Output Supply on indication BUZER Lamp ON HV TX
- Control Unit Body Earth Terminal
- High Voltage Sensing Signal Socket
- Earth fail protection with indication