TECHNICAL SPECIFICATION :

1. POWER ON : MCB SWITCH
2. ON OFF INDICATOR PUSH BUTTON
3. VOLTE METER : SHOW ON OUT PUT HIGH VOLTAGE (Digital type meter)
4. CURRENT METER  : SHOW ON LEKAGE CURRENT     (Digital type meter)
5. PROTECTION : OVER LOAD TRIP PROTECTION LV & HV both side AC-DC HV
6. TIMER  : TESTING TIME  1,2,5 MIN( inbuilt un visible timer)
7. CONNECTION :-  POLARITY CONNECTOR PROBE IN PUT & OUT PUT CONNECTION
CONTROL PANEL DESCRIPTION :
  • INPUT SUPPLY 230 VAC 50 Hz 1 Ph
  • POWER ON Switch
  • SAFETY KEY
  • Control Unit Start Push Button
  • Control Unit Stop Push Button
  • Timer ON Switch with indication
  • Timer RESET Push Button
  • Test ok indication lamp
  • Leakage current meter reading push ON Switch
  • Set High Voltage KNOB with zero start protection
  • Output  High Voltage Indicating Meter for AC- DC
  • Output Current leakage Indicating Meter AC – DC
  • Input Supply short circuit Protection MCB
  • Input Supply IP 44 Socket
  • Output Supply on indication BUZER Lamp ON HV TX
  • Control Unit Body Earth Terminal
  • High Voltage Sensing Signal Socket
  • Earth fail protection with indication